Giant
Airplanes will land near the sea beach and will fly the same way. Cox's Bazar
will be the busiest city in terms of day and night flights. This is no longer a
dream, soon it will be a reality. The Coxsbazar Airport will be a world class
airport in Bangladesh. For the first time, a runway is going to be built over
the water with the help of most modern and sophisticated technologies. Work on
ecotourism and railways including exclusive tourist zones are going on here.
The
ground-breaking of the construction of the runway in the sea water in Cox's
Bazar took place on 29 August, 2021. Inaugurating the expansion work in the
morning, Prime Minister Sheikh Hasina said the government has different plans
for development of Coxsbazar. Cox's Bazar will be arranged in the style of
Singapore, Bangkok. Bangladesh took another step forward in development through
ground-breaking of seawater runway construction. Cox's Bazar Airport is getting
the final outline by putting an end to all speculations. Will take shape from national
to international.
Coxsbazar
Airport runway construction style is the first in this region by penetrating
the sea water. Such type of runways is not available all over the world. The
Cox's Bazar Airport Runway project will be longer than runways in Maldives,
Korea, Japan, Taiwan and Singapore etc. It will be one of the most scenic
airports in the world. This will be the longest runway in the country. There
will be 1,300 feet inside the sea. Giant aircraft like Airbus A-380 will be
able to land in Cox's Bazar Airport through the blue water of the sea. The
Civil Aviation Authority (CAA) is trying to build an airport similar to other
countries in the world. The Prime Minister himself has said that this airport
will be developed as a regional hub. The runway will be built by creating
special blocks inside the sea. Besides, there are plans to have small cottages
around the runway. There are even plans to have a re-fueling station. Besides, international
Star quality hotels and motels will also be built in the vicinity of the
airport.

State
Minister for Civil Aviation and Tourism, Mahbub Ali said that all natural
facilities are being taken up in the master plan of the airport as a tourist
city. The state-of-the-art architecture will include Cable-Car, Sea Museum,
Blue Zone, Red Park, and Parachuting High Park etc. There will be world class
top events for entertainment. Several foreign companies have already offered to
invest here. He said the international airport is being set up mainly so that
domestic and foreign tourists can come to Coxsbazar by direct flights. For good
reason, construction of a new terminal building at the airport, expansion of
runways and increase in power, installation of airfield ground lighting system
and other works are going to start soon.
The
project is targeted to be completed within the next 33 months. The expansion
and modernization of the runway at Cox's Bazar Airport has started mainly based
on the interest of the Prime Minister of Bangladesh. The length of the runway
has already been increased from 6,775 feet to 9,000 feet and the width from 120
feet to 200 feet. The Prime Minister inaugurated Biman's Boeing 737 take-off
and landing on the expanded runway in 2017. At the same time, he directed to
upgrade the runway of the airport from 9,000 feet to 12,000 feet. Under his
direction, the 'Cox's Bazar Airport Runway Expansion' project was undertaken
between January 2019 and December 2021.
In
addition, Precision Approach Cat-1 lighting system will be installed. As a
result, the aircraft will be able to take off and land at full load. Due to
which the number of flights at the airport as well as the passenger transport
capacity will increase. Cox's Bazar Airport currently has a runway of 9,000
feet. Work began to raise it to 10,700 feet. Of this, 1,300 feet will be in the
sea. The runway is being expanded through the acquisition of land towards the
Maheshkhali Channel at Cox's Bazar Airport. The project has stumbled repeatedly
despite being such a priority.
On
December 2020, the China Civil Engineering Construction Company (CCECC) was
approved as a contractor by the government's Cabinet Committee on Procurement. If
the project is implemented, new generation aircraft like Boeing-777-300ER,
747-400 and Airbus A-380 will be able to take off and land easily. The estimated
cost of the project is BDT 1,568 Crore. The work is ongoing on the current
Corona epidemic. Work is underway to fill the sea with sand near Maheshkhali
and Sonadia islands. Construction Work of the terminal building inside the
airport is also nearing completion. The infrastructure and welding work of the
terminal building has already been completed. Finishing work will start soon.

On
February 9 this year, an
agreement was signed between China's Changjiang Ichang Water Engineering Bureau
(CYWCB) and China Civil Engineering Construction Corporation JV as the lowest
bidder at Civil Aviation Authority, Bangladesh headquarters.
The two companies offer at least 21 percent less than the estimated cost of the
Civil Aviation Authority.
As a result huge amount of money will be saved. The two Chinese companies,
which have received construction permits, have experience building
state-of-the-art airports, such as the Beijing Airport. The Coxsbazar Airport will
also have all kinds of modern facilities, which will enliven all the tourists
in the world.
Civil Aviation Authority
officials say that when the construction of the runway is completed, the sea
water will be on both sides of the aircraft when it lands or takes off. Cox's
Bazar will be the fourth International Airport after Dhaka, Chittagong and
Sylhet in Bangladesh. The runway at Dhaka Shahjalal International Airport is
10,500 feet. When the work of Cox's Bazar is completed, Dhaka will become the
second largest runway. As far as the runway goes to the sea, dams will be built
in the water using blocks, geo-tubes and other standard materials.
Officials
said, “At first we wanted to see if the runway could be extended towards the
city. Moreover, if it moves towards the city, many important installations will
move towards the airport. Many would have suffered massive losses. However, the
Prime Minister wanted to have a runway towards the sea, which would enhance its
beauty”. The official further said that the runway will be towards Maheshkhali
channel. Work has also started on a new terminal building at the airport.
Besides, ground lighting system, central line light, precision approach
lighting up to 900 meters under the sea, instrumental landing system,
construction of safety wall and Connection Bridge over Banshkhali River will be
installed. The flight will take off and land at Cox's Bazar after being
transformed into an international airport and after discussions with various
countries around the world.
Thanks,
Related:
Third Terminal at Shahjalal International Airport Dhaka
Karnaphuli Tunnel Project in Chattogram
Laksham - Lalmai Dual Gauge is Ready
Cumilla - Noakhali regional highway Four Lane
Dhaka-Cumilla-Chattogram Controlled Access Expressway
Dhaka to Comilla and Comilla to Dhaka
Highway Hotels and Restaurants in Comilla
Tripura-Kolkata Neval Route via Gomti Comilla
Cumilla Division | The Demand of Time
Dhaka-Cumilla Jam Free Alternate Route
Cumilla to Dhaka only in One and Half Hour
Dhaka - Cumilla - Chattogram High Speed Rail
Mega projects in Coxsbazar | Industry and Tourism Sector
Tourism Industry of Bangladesh | Safe Investment
Metro Rail Dhaka | First Train has Arrived
Matarbari Power Plant Raising its Head